Finished product from the 325cu m3 pour. Float finished to contractors specification
Steel tied box and fire collars installed ready for concrete. This half of the pour is 325cu m3. Stop end formed using Hy- rib mesh to allow the second pour to tie into this one
Concrete Foundation Slab
Site Set Up
Schock balcony connectors tied to top mat and held in position by timber shutter
Attenuation Tank
Resin bound gravel path with Maccaferri Wall system