Our

projects

3559e0f9 e7da 418a b69e a0283049344a

Finished product from the 325cu m3 pour. Float finished to contractors specification

3559e0f9 e7da 418a b69e a0283049344a

Steel tied box and fire collars installed ready for concrete. This half of the pour is 325cu m3. Stop end formed using Hy- rib mesh to allow the second pour to tie into this one

Steel work in place for concrete foundation slab

Concrete Foundation Slab

Site set up

Site Set Up

Site set up

Schock balcony connectors tied to top mat and held in position by timber shutter

Attenuation Tank

Attenuation Tank

Resin bound gravel path with Maccaferri Wall system

Resin bound gravel path with Maccaferri Wall system

Road2

Driveway

Road1

Road Construction

Fencing2

School Picket Fencing

Fencing1

Metal Fencing